Midden Groningen 103MW Solar Park in the Netherlands

Solar Project Overview

Project Type

Centrale au sol

Project Location

Hoogezand-Sappemeer, the Netherlands

Installed Capacity

103MWp

Grid-connected Date

The construction of Midden Groningen Solar Park began in early 2019, and was connected to grid on 10th December, 2019.

Project Owner

Blue Elephant Energy

Power Generation

97,850 MWh First-Year

Module Type

ASTRO Module (325Wp)

Project Highlights

One of the largest power stations, Midden Groningen 103MW Solar Park was the first to be integrated into the TenneT State grid in the Netherlands, which was successfully connected to the grid in December 2019. As a kind of mainstream product of mass production in 2019, 315,000 high cost-performance ASTRO modules (325Wp) were installed on 117 hectares of land, have effectively increased the project power generation.