Lutai 200MW Solar Park
Solar Project Overview
Project Type
Gobi Solar Park
Project Location
Aksay Kazak, Gansu Province, China
Installed Capacity
200MW
Module Type
ASTRO 6 Monofacial Module (670W)
Project Owner
CHINT
CO₂ Prevented
414,515 tons average annual
Power Generation
416 million kWh average annual
Grid-connected Date
On September 26, 2021, the project was constructed and was connected to the grid on September 30, 2022.
Project Highlights
Tutai 200MW Solar Park installed a total of 384,636 ASTRO 6 modules with core strengths of high power, high efficiency, high quality, low voltage, high string power, and low BOS and LCOE. As the video shows, the project is shaped as a topographic map of China’s Gansu Province, building a Green Silk Road in the Gobi Desert.
This is the fourth PV project constructed by CHINT at Aksay, making the total installed capacity of local CHINT-constructed plants hit 294MW. On the same day that the Lutai project started to generate electricity, the fifth CHINT-constructed project at Aksay – Yintai 100 MW PV project – was announced to start construction.